|
|
|
马上注册,结交更多好友,享用更多功能,让你轻松玩转社区。
您需要 登录 才可以下载或查看,没有帐号?FreeOZ用户注册
x
RPL的FormPASA2.0(RecognitionofPriorLearning)_Sections2-4这个里面,section4是要写2个project。里面的要求原话是
A project report is a coherent written description of a project or engagement that provides you with the opportunity to show how you perform as an IT (Computing) Professional, and enables assessors to understand and question your thought processes and decisions. Each report is to relate to a significant project or work episode undertaken by the applicant during his or her professional career.
The purpose of these reports is to enable applicants to demonstrate their command and implementation of the areas of knowledge claimed in Sections 2 and 3 of your application.
Please note that:
Applicants are required to provide two project reports.
Of the two reports, one must pertain to project undertaken within the last three years, and the other for project within the last five years. Projects over two years long may be used for both reports under either of the following conditions:
• The project has clearly-defined work efforts which took place in parallel, each with their own solution development and design activities and their own deliverables.
• The project had clearly-defined phases that were executed in succession, each with its own solution development and design activities and deliverables. Note that a second project phase that constructs and implements the solution developed by the first phase does not meet this requirement.
Depending on the nature of the applicant’s role in the project, this would be expected to cover a selection of such factors as:
• System analysis and design and software engineering methodologies used;
• Contribution to the processes involved in the design and implementation of enterprise-wide computer systems;
• Programming languages, design paradigms and implementation procedures adopted;
• Database and/or file design and management techniques employed;
• Network topologies, including size, distribution and security facilities installed;
• Project management and quality assurance techniques followed;
• Internet application design, including database interactivity and security measures implemented;
• ICT managerial activities, demonstrating the nature and extent of responsibilities
但是在线提交的时候,上传的位置,那个下拉列表,除了有Sections2-4,还有2个project document。
有点困惑是,是需要从新写2个project上传,还是只上传section2-4就好了?还是上传了section2-4,然后把里面的project report复制一下然后单独上传就可以?
求解答。。 |
|